Business Purpose

“Improvement of the benefits of shipbuilders, distributors, buyers, and local residents through facility modernization”

문제점, 개선으로 구성
Problem improvement
Increased congestion due to wholesale and retail mixture 개선된 Relaxation of congestion through wholesale and retail separation
Open in 1985, aging facilities 개선된 Expansion of the latest logistics facilities and functions
More than 1.6 times compared to design volume (4,680 tons/day) 개선된 Securing actual transaction volume (7,593 tons/day) space
뱃지 아이콘
Business outline and progress
사업기간, 총사업비로 구성
Business period 2009-2031 (5th Phase of reconstruction)
Total project cost 989.7 billion won (2,795 retail rights / wholesale rights 7,102)
  • Retailer
    ('09 ~ '16)
    업무동, 가락몰
    Business building, raring mall
  • Wholesale Zone 1
    (~ '24)
    채소2동
    2 vegetables
  • Wholesale Ticket 2
    (~ '28)
    채소1동, 수산동
    1 vegetable, Susan-dong
  • Wholesaler 3 Section
    (~ '30)
    과일동, 환경동
    Fruit dong, environmental building
  • Wholesale Section 4
    (~ '31)
    공동배송장
    Shared delivery room
뱃지 아이콘
Overview of business by tool

Retailer (Garak Mall, Business East)

소매권(가락몰, 업무동)
사업기간, 사업비, 건축연면적, 건물규모, 비고로 구성
Business period 2009 ~ 2015 (completed before 16 years)
Project cost 989.7 billion won (2,795 retail rights / wholesale rights 7,102)
Building area 210,958㎡ (54,828㎡ of land area)
Building size 3 floors below ground and 18 floors above ground
Note Retail / Parking space: 2,048 spaces

Wholesale Zone 1 (2 vegetables)

도매권 1공구(채소 2동)
사업기간, 사업비, 건축연면적, 건물규모, 비고로 구성성
Business period 2017 ~ 2024
Project cost 130.5 billion won
Building area 210,958㎡ (54,828㎡ of land area)
Building size 1 basement floor ~ 3 floors above ground
Note 11 items such as radish, cabbage and garlic

Wholesale Zone 2 (1 Vegetables)

도매권 2공구(채소 1동)
사업기간, 사업비, 건축연면적, 건물규모, 비고로 구성성
Business period 2020 ~ 2028
Project cost 168.4 billion won
Building area 82,351㎡ (59,989㎡ of land area)
Building size 1 basement floor ~ 3 floors above ground
Note 182 vegetable items

Wholesale Zone 2 (Susan -dong)

도매권 2공구(수산동)
사업기간, 사업비, 건축연면적, 건물규모, 비고로 구성성
Business period 2020 ~ 2028
Project cost 144 billion won
Building area 63,977㎡ (44,095㎡ of land area)
Building size 1 basement floor ~ 4 floors above ground
Note All items of fisheries

Wholesale Zone 3 (Fruit-dong, Environmental East)

사업기간, 사업비, 건축연면적, 건물규모, 비고로 구성
Business period 2023 ~ 2030
Project cost 222.6 billion won
Building area 98,116㎡ (122,870㎡ of land area)
Building size 1 basement floor ~ 3 floors above ground (fruit-dong)
Note All fruit items

Wholesale Zone 4 (Joint Shipping, Horizontal Green Space)

사업기간, 사업비, 건축연면적, 건물규모, 비고로 구성성
Business period 2029 ~ 2031
Project cost 44.7 billion won
Building area 690㎡ (site area 189,433㎡)
Building size Na Daeji (joint delivery note)
Note Parking space: 2,040 spaces
뱃지 아이콘
Business effect

Expansion of logistics facilities

사업효과 내용으로 구성됨
건물연면적 아이콘 Building total floor area
1.2 times increase
(Temperature control facility in trading area)
소분가공장 아이콘 Small processing plant
4.7 times increase
(3,493㎡ → 16,256㎡)
저온창고 아이콘 Cold storage
3.3 times increase
(3,945㎡ → 12,954㎡)

Improved traffic and parking conditions

사업효과 내용으로 구성됨
1.6 times the parking area / Creation of a joint delivery area
(5,319 pages → 8,321 pages)
공동배송장 조성
사업효과 내용으로 구성됨
Separation of import and export / one-way flow design
반입, 반출 분리/일방향 동선 설계

Environmental and local friendly

사업효과 내용으로 구성됨
Green Building Certification
Excellent rating
Building energy efficiency
1++ rating
new and renewable energy
Supply rate 27%
녹색건축인증 에너지절약 신재생에너지
사업효과 내용으로 구성됨
Creation of inner and outer green space (more than 15%)
뱃지 아이콘
The future of Garak Market
가락시장 미래모습 도식화 이미지 가락시장 미래모습 도식화 이미지
뱃지 아이콘
Building construction overview
건물공사 이미지
  • Smooth relocation of Vegetable Building 2 promoted through participation of distributors, activation of relocation council (36 times in total), and discussion and decision on major issues.
  • Accident-free completion through thorough process management and safety accident prevention (October 2024)
사업기간, 사업비, 건축연면적, 건물규모, 이전대상, 주차면수, 안내도로 구성
Project period March 2017 ~ October 2024
Project cost KRW 130.5 billion (18% of the total KRW 710.2 billion in the wholesale area)
Total building area 57,067㎡ (site area 59,477㎡)
Building size 1st basement level ~ 3rd floor above ground
Transfer target 11 items including radish, cabbage, garlic, green onion, onion, etc., 345 people (270 special, 75 regular)
Number of parking spaces 793 units (legal number 486)
Guide map Check out the vegetable building 2 guide.
뱃지 아이콘
Building construction milestones
  • Design
    (March ‘17 ~ October ‘20)
    Basic and detailed design
  • 다음
  • Construction work
    (February ‘21 ~ October ‘24)
    Construction work
  • 다음
  • Distributor transfer
    (‘24. November ~ December)
    Distributors move in and normal business begins
뱃지 아이콘
Building construction
건물 공사 모습 건물 공사 모습
  • February - December 2021
    Demolition, earthwork, pile work
  • December 2022
    Steel frame, 3rd floor floor installation
  • December 2023
    3-story floor, column frame
  • October 2024
    Approval for use (city → construction)
뱃지 아이콘
Facility and operational innovation

Implementation of an eco-friendly market

친환경 시장 구현 관련 로고
  • 1. Green Building Certification Excellent Grade
  • 2. Building energy efficiency level 1++
  • 3. Renewable energy supply ratio 27%
    geothermal
    15%
    1,336kw supplied for heating and cooling of auction house and store
    (Usage of 535 apartment households)
    solar power
    12%
    3,773kw supplied to the public power system
    (Calories enough to turn about 1,000 tons of water into ice in 1 hour)

Improvement of facilities and equipment

  • 1. Auction house and store temperature control system introduced
    Maintain temperature above 5°C in winter and below 26°C in summer.
    Maintain freshness and enhance product protection
  • 2. Commercialization of agricultural products and expansion of storage facilities
    Installation of a dedicated 4,800㎡ warehouse (3rd floor)
    Responding to consumer product segmentation needs
  • 3. Closed building blocks external exposure to noise and light
  • 4. Newly allocated stores and offices for wholesalers of special items (270 people)
  • 5. Installation of convenience facilities such as showers, restaurants, convenience stores, gardens, etc.

Leading the smart market

  • 1. Introduction of electronic invoice system for all items
    Advance prediction of incoming volume, logistics efficiency
    Implementation of pilot project for 6 items (November 2023)
    Expansion of introduction of all traded items (October 2024)
  • 2. Vegetable Building 2 joint logistics system introduced
    Selection of logistics company and pilot project (August 2024)
    Efficient logistics movement using cutting-edge operating systems
    Step-by-step expansion by modernization tool
  • 3. Vegetable building 2 all item pallet unloading transaction
    Step-by-step mandatory modernization for each tool
뱃지 아이콘
Overview of transaction items
Transaction item
Onion, green onion, garlic, chive, cabbage, radish, cabbage, ginger, dried pepper, radish, corn, etc. 11
Transaction size
Approximately 37% (817,000 tons) of the Garak Market fruit and vegetable trading volume (2,188,000 tons in 2023) was traded in Vegetable Building 2.
뱃지 아이콘
Characteristics of each transaction item
사업기간, 사업비, 건축연면적, 건물규모, 이전대상, 주차면수, 안내도로 구성
Division Onion Green Onion Garlic chives Napa cabbage Radish Cabbage Ginger Dried pepper Bachelor dance Corner
Painting 양파 대파 마늘 쪽파 배추 무 양배추 생강 건고추 총각무 옥수수
‘23 year supply
(thousand tons)
229 100 36 22 128 162 92 7 2 32 7
‘23 year amount
(billion won)
2,559 1,886 1,751 952 902 846 714 501 318 316 137
Auction time 23:00 20:30 Listing exception
list price
22:30 23:00 22:30 22:00 Listing exception
list price
Listing exception Listing exception
list price
19:30